on 2023 Jun 08 9:42 AM
Hi all,
I am facing issues with LOSC.
Item is requested for staging from storage type A to storage type E.
Picking is required, so EWM creates interim LB for HU from storage type A to storage type D.
The HU needs to be handed over via handover point, so another interm LB for HU is created from storage type A to storage type C.
Those LBs are created correctly.
Before the HU can reach the hand over point, it has to pass an elevator, so another interim LB for HU should be created from storage type A to storage type B.
Because I like drawing pictures, here the visualization of the as is and as should be situation:
As is:
As should be:
Somehow the system only creates a maximum of two interim LBs, so 3 LBs in total.
Can anyone explain to me why this is happening and a way on how to solve this issue?
Thanks in advance and best regards,
Benjamin
Request clarification before answering.
hi, can you try to make configuration as below:
SAP Logic, System use source and destination location of warehouse task and compare with configuration. If there is an intermediate locations in between, System creates 2 tasks:
Task 1: Source to intermediate locations.
Task 2: intermediate locations to Destination.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Ngan,
thank you very much for your input. But unfortunately this would not work in our scenario. Because we can not perform actual picking in B. Picking is required to happen in D, directly before staging. I guess this would work if we have complete HU movements.
We have multiple resource changes in this scenario.
Pick Up 1: A to B
Pick Up 2: B to C
Pick Up 3: C to D (Here picking happens)
Pick Up 4: D to E (Final staging)
User | Count |
---|---|
5 | |
4 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.