on 2024 Dec 09 1:16 PM
I would like to consider the quality stock for MRP selectively for some materials in a plant. Is it possible? Available stocks in OPPQ are at the plant level.
Request clarification before answering.
Hi,
The Quality stock will be considered in the MRP as per the standard SAP.
If you want to exclude the quality stock for a few meterials then it can be handdled by two ways.
The BAdI mentioned by an expert @DominikTylczyn. Other ways would be a sepearte storage location and exclude it from the MRP. In OMIR for the storage location to be set to 1 if you are in ECC and assigned to those materials . If you are using S4H then MRP area would be needed.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.