on 2008 Sep 22 8:16 AM
I want to know if forecast horizon setting in product master works with CTM engine or not .
I have a requirement where i dont want to consider demand for different product in their lead time .When i tried defining this in Forecats horizon in product master and ran CTM , It didnt consider it .
Or is there any other way through which this can be achieved
>
> I want to know if forecast horizon setting in product master works with CTM engine or not .
> I have a requirement where i dont want to consider demand for different product in their lead time .When i tried defining this in Forecats horizon in product master and ran CTM , It didnt consider it .
> Or is there any other way through which this can be achieved
Hi Shyam,
Have you thought about using the Order Selection profile?
Through order selection profile you can choose your products (Master Data selection) and choose the Relative time period under Time-Related Section in the same screen.
You can give certain no. of days for which the system will not consider the demand for the products given in the master data selection profile.
For example, today is 22/09/2008
You give Start in as 5 days
and duration 15 days.
The system chooses only those demands between 28/09/2008 (five days after the current date) and 12/10/2008 (15 days from the planning start date).
Check whether this statisfies your requirement.
Thanks,
Rajesh Manoharan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you are correct... its not supported with ctm upto v5.0
I have not tried with v5.1 yet.
I don't know any creative workaround either.
Ken snyder
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shyam,
This is the only way of doing it in Std System and you can do customize development using BADI,FM , exits as per your requirement.
Within this horizon, Supply Network Planning (SNP) does not take the
forecast into account when calculating total demand. Outside of this
horizon, the system calculates total demand using either the forecast or
sales orders and both depending upon the requirement strategy.
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
4 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.