Former Member
0 Kudos

Hello Experts,

An error saying 'Error during scheduling' is logged while running Run order sequencing in Production Planning Run and the job is failed.

Checked the capacity of the resource but seems ok.

The below long text is displayed next to the error message.

Error during scheduling

Message no. /SAPAPO/OM043

Diagnosis

The system could not schedule an order, operation or activity.

This could have the following causes:

  • The resource does not have any free working time or capacity.
  • If you have set planning direction backwards in the strategy profile:
    There is not enough working time or capacity available for scheduling between now and the scheduling date.
  • If you have set planning direction forwards in the strategy profile:
    There is not enough working time or capacity available for scheduling between the scheduling date and the end of the planning area.
  • If you plan characteristics-dependently:
    You have assigned characteristics to operations of the order that do not agree with characteristics of the resources on which the operations are to be processed.
    The system cannot find any suitable characteristics on the resources and so it cannot schedule.

Procedure

Depending on which of the above reasons is the cause, change the following settings:

  • Change the working times and capacities of the resources.
  • Set the planning mode "infinite planning" in the strategy profile.
  • Activate the planning direction forwards or backwards and reverse in the strategy profile.
  • Change the characteristics that you have assigned to the resource.

Can anyone let me know what else need to check to avoid the error.

View Entire Topic
former_member189901
Contributor
0 Kudos

Hello Maddy,

first of all if you want to avoid the Job failure you can follow as advised by Santosh,

Or else check whether you have used consider maximum interval in your strategy parameter for dependent objects  , please remove it .It'll work fine...

Regards

Debashis