cancel
Showing results for 
Search instead for 
Did you mean: 

Destination HU in outb.staging zone

0 Kudos
3,311

Hi guys,

I have outb. process with the next steps:

OB01 (pick) - OB03  (staging)

I have maintained staging bay in /SCWM/STADET_OUT, for example st.bin SB-01

When outbound delivery created SB-01 is determined - it`s ok.

Then worker place 2 HUs (pallets) in SB-01, for example HU1 and HU2.

When worker completed picking (OB01) system propose move pick-HU (box) to dest. st.bin SB-01 and dest. HU = pick-HU.

How can worker confirmed WT to HU1 or to HU2 without applying exc.code chhu? I need choose dest.HU at the moment when confirm WT.

Thx for answers.

BR, Alex.

View Entire Topic
venky1988
Explorer
0 Kudos

Hi,

I think you can achieve this through verification profile.

Pre-requisite

1. maintain HU mandatory in staging area.

2.dont create pick hu.But packing profile should be maintained in WOCR but create HU should be disabled.

3.either in storage type or in process type it should be maintained adopt content to pick HU as Suraj explained.

4.in verification profile disable dest HU scannig.

in this case even though des hu scanning is disabled since HU is mandatory in staging area it will prompt the operator enter the dest hu. At this point he can create the pick hu or he can scan already created HU i.e. HU 1 or HU 2

regards,

Venky

•••

0 Kudos

Hi!

Thanks for reply, but I need create pick-HU when starting process the WO.

BR, Alex.

venky1988
Explorer
0 Kudos

Hi,

you can create the pick HU if required. as per my knoledge if you deactivate the create HU. it will still propose the pack material but not HU number . if pick HU is required he will click on new hu (F2).

another option is available in packing profile "assign HU to task."  You can explore that option .

regards.

Venky