on 2020 Jun 04 8:59 PM
Hi,
The scneario is that we have PPM on S/4 HANA 1809 on premise and PS on seperate ECC box.
I need to synchronize the status (system as well as user status ) from PPM project to PS project . Is there any out of box function available to achieve the same using customizing or I should develop the interface between the two? Any documents in regards to the same would be helpful.
Regards
Kanishak
Request clarification before answering.
I have implemented the same requirement following instructions from below blog
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.