cancel
Showing results for 
Search instead for 
Did you mean: 

Please check what is incorrect in my Production Process Design(PPD)

Wonpyo
Explorer
0 Kudos
176

Dear DM users,

I am having a trouble with PPD because of lack of knowledge.

Basely, Activity Confirmation does not automatically posted when the SFC complete as opposed to Quantity Confirmation. To confirm SVK's activities automatically, I have made a PPD like below picture, which was advised by @benwildridge.

Wonpyo_2-1730443257718.png

 

I would like you to check what was missed on my work. Here are my production process' configurations. You can see each components' configuration and parameters below, and the pictures are ordered by the process flow. (No picture = no configured)

Wonpyo_3-1730443280408.png

Wonpyo_4-1730443329339.pngWonpyo_5-1730443348743.pngWonpyo_6-1730443386454.pngWonpyo_7-1730443399458.pngWonpyo_8-1730443414649.png

Wonpyo_4-1730787696398.png

Wonpyo_10-1730443456636.pngWonpyo_11-1730443467820.png

 

Then, I assigned the PPD to the routing in Manage Routings(not sure if it's needed), and to Start button action in POD designer.

Wonpyo_12-1730443734530.png

Wonpyo_2-1730787332202.png

 

Finally, it fails on POD.

Wonpyo_0-1730853384323.png

error message: Elapsed duration for the operation activity 1000141-000000-0010 couldn't be retrieved.

 

This is the order and the operation activity's information. Also, now is 24.11.05

Wonpyo_3-1730787522990.png

 

If my description of this question needs more clarity, please feel free to ask for it.

 

Best wishes,

Wonpyo

 

Accepted Solutions (0)

Answers (0)