on 2018 Feb 05 4:03 PM
Dear MRS experts,
I use MRS 10 with PM/CS Order and HR resource as Resource class in Basic settings.
I have several questions related to MRS.
1) Allocated ressource : backward integration from MRS to PM/CS order
In MRS Planning Board (tcode /MRSS/PLBOORGSRV): when a ressource (HR Pers. number) is allocated to a demand I would like the corresponding PM/CS operation to be updated (field "Person. no" which is AFVGD-PERNR).
With the backward integration of splits it works fine but I'like to avoid splits and have the field "Person. no" updated.
2) System status DSPT (Scheduled) at operation level
Same question for system status DSPT at operation level.
I managed to integrate abstract status PLAN_FULL with a user status at operation level but not with a system status like DSPT at operation level.
3) Display demand address in Planning Board
I would like to display the address of the demand (work order address in my case) in Planning Board (e.g. in the worklist).
I've found BAdI /MRSS/RSG_DEMAND_ADRESS_GET with a standard implementation that allocate an address to a demand which is fine but I cannot find the way to display this address it in the Worklist.
How can I achieve this?
Thank you very much for your help
Regards,
Philippe
Request clarification before answering.
For Q #1.
this is possible with 1:1 assignments in MRS
For Q # 2.
You can do abstract status mapping for DSPT as well at item level. Read the documentation in /MRSS/IMG for abstract status.
Q#3 is already answered I see.
cheers,
Mohammed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.