cancel
Showing results for 
Search instead for 
Did you mean: 

Running BPC Controls - Scheduling ?

0 Kudos

Hi

I have configured the SAP BPC controls on webclient. There are multiple controls which need to be run multiple times in a day and based on the result adjustment will be made by multiple users.

The above requirements need the controls execution to be scheduled/automated after a regular interval.

Could you pls suggest how I can schedule the same. I have read on this subject and found there was a Process chain /CPMB/VALIDATIONS but it has been obsolete.

PS: I have SAP BPC 10.1 classic.

Thanks!

Waseem

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member186338
Active Contributor
0 Kudos

Yes, chain /CPMB/VALIDATIONS is obsolete

https://launchpad.support.sap.com/#/notes/1773600

And you can do nothing.