on 2024 Jul 25 2:28 PM
Hello guys,
I am integrating AFO with SAP DM to load data from SAP GR.
I understand that this AFO will be written locally with the datacache (excel file), however it is currently pointing to development. How do I change this connection when I send the transport from development to production?
I found this note that shows how to change it, but would I have to do it manually on each AFO. If I have 300 AFOs in datacache, will I need to manually adjust each one? Is there no option to do it in mass?
2448743 - How to replace the system of an existing Analysis Office workbook
https://me.sap.com/notes/2448743/E
Would this be different if I used queries? Since it would be pointing to a connection created in SAP DM and then I can change it in mass via change datalink.
Tks,
Felipe B.
User | Count |
---|---|
11 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.