I have a issue in my present client where they want to test the below scenario.

They created a PO referring to Real Internal Order which have budget in that particular year. Now in next year when they did the Goods Receipt they want to check whether the system will check for the budget of the Internal order or not.

There is an OSS note 046209 which explains that system would not check during Goods Receipt and if needed we can achieve it through user exit.

Is there anyway i could test this case. I created a PO on year ending lets say DEC 15th referring to Internal order. I could not do the MIGO with posting date as 2011. I tried to close the period of 12 in MMPV but my system throws an error of MMPV_DATE_CHECK referring to note 1082841.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Dear,

dont try to change period for this checking of budget, if the WBS TEC closed then try to do GR, it should not allow GR. then open WBS TEC then it will allow so it will be a kind of check of the system.

Regards,

qsm sap

Former Member
0 Kudos

Hi,

The process of check the availability of Budget is done during PO saving itself. You will be able to create the PO only if buget is available.

Now is the WBS element or project is Closed ?. is the WBS Budget expired i.e its validity. If yes then you GR will fail in the first place.

Hope this helps,

Thx