on 2011 Aug 30 9:43 AM
Hi Guys,
I have a material documnet as a result of physical inventory differances,
But it is picking wrong profit centre and cost centre valus
How can I change these for newly created Material documents in future.
Please help
Thanks in advance
SAP MM
Hi
What do you mean by Wrong CC??
Depending on what CC you would have assigned in OKB9 for Plant Level or Comp Code level or PC Level - The same should get picked up
Please respond with details if thats not the case
br, Ajay M