cancel
Showing results for 
Search instead for 
Did you mean: 

wrong profit centre and cost centre values

Former Member
0 Kudos
49

Hi Guys,

I have a material documnet as a result of physical inventory differances,

But it is picking wrong profit centre and cost centre valus

How can I change these for newly created Material documents in future.

Please help

Thanks in advance

SAP MM

Accepted Solutions (1)

Accepted Solutions (1)

ajaycwa1981
Active Contributor
0 Kudos

Hi

What do you mean by Wrong CC??

Depending on what CC you would have assigned in OKB9 for Plant Level or Comp Code level or PC Level - The same should get picked up

Please respond with details if thats not the case

br, Ajay M

Answers (0)