Hi

I am Rahul Here.

In a roll out project we want to migrate all the WM data from Server 1 to Server 2.

can someone tell me what all the things are required to be done?

What should be the process?

The process as per my knowledge

1. Download from existing server1 in a format (What that format should be?)

2. Uploade the files to the new system in the same format.

Please comment. Urgent please.

Rahul

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

what do you mean with WM data?

Do you talk about stock? or material master? or customizing data?

0 Kudos

I mean to move all the master data from old system to new as well as to move all the stocl

JL23
Active Contributor
0 Kudos

Is it just WM that moves, the entire SAP system?

As the material master views will go with the rest of the material master.

So there is no extra/additional work.

In any case, check following link for the datatransfer in WM:

http://help.sap.com/saphelp_40b/helpdata/es/dc/1939516e36d1118b3f0060b03ca329/content.htm