WIP is for Material in REM

Former Member
0 Kudos

hi all

a.how to calculate the WIP is for Material in REM

b. whether wip material is same HALB

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

In addition to master data of REM - materials, BOM, Workcenters, Routing/rate routings, Production Version, Product cost collector, you must have Reporting Point to have WIP.

You can give reporting Reporting Points in Routing / Rate routing will Mile stone confirmation at that point.

While backflushing, at every reporting point there will be confirmation and will have WIP.

To check WIP - transaction code is MF26.

Pl. try this.

Srini

Former Member
0 Kudos

client need the value of the wip material with the quantity

as a report for the top 10 A materials

how to find this .

more is it, wip cost is pord + material cost

Former Member
0 Kudos

Please refer to below link

http://help.sap.com/saphelp_47x200/helpdata/en/5f/1faba54aee11d189740000e8322d00/frameset.htm

my apologies for missing in previous reply.

Former Member
0 Kudos

hi,

what are the cost incurred in the WIP COSTING

its only production cost or sum of prod cost +material std cost

can i have ur mail id and ur cell number

i need to clarify some doubts

raj

09980632320

Former Member
0 Kudos

Hi Raj,

In REM, cost object is product cost collector, in production order process production order itself is a cost object and WIP is calculated for the order itself.

In REM WIP has to be calculated for the cost collector, cost collectors can individually be processed by KKAS and collectively by KKAO (select the option with product cost collector and deselct production and process order option).

Reward if useful.

Thank you

Anand