Hi

Can the valuation class of the material be changed ? If there is some stock for the material , then what are the steps to be followed before changing the valuation class ? If there are some open pos then what are the steps invloved before changing the valuation class of the material ?

Thanks

Dev

Accepted Solutions (0)

Answers (2)

Answers (2)

fabio_almeida
Active Participant
0 Kudos

Hello,

Basically you have two options:

1) remove all history for stock material. I mean, it is not enough just to remove the current quantity in stock, you have to remove all the history what is quite difficult.

2) change the material number as for example: from Material 'ABC' to Material 'ABC-DUMMY', and then create a new material master data as 'ABC' with the correct valuation class. Therefore, history will be lost. But you could set the MPN-set to keep both materials as interchangeables.

I hope it helps you.

Fábio Almeida

MM consultant

former_member187989
Active Contributor
0 Kudos

Dear,