Dear Masters,

I have two BOM's for one material.I have created production versions for the same.

1.I want to create two production orders using two BOM's? How to create ?

Also how we can use the production versions at the time of creting production orders using MD02 & MD04?We have Make To Stock strategy.

Thanks & Regards,

Ram Kulkarni

View Entire Topic
Former Member
0 Kudos

Hi Ram,

if u create production order by manullay, u can select production version manuulay by doing following settings.

1. Goto OPL8 define production selection = Manual selection for your ordre type/plant combination

2. Define Bom selection method = 2 or 3 by production version.

while creating production order(Co01) system will ask u to select production version

For MRP run,

system always select first valid production version by default. Here u can define lotsize to select production version. And another way is u can define Quta arragement inthat u can define percentage quota for each production version.

while creating production order from planned order (MD04) system will copy the production version from the planned order.

regards

pradeep

Former Member
0 Kudos

But while running std cost using TCode CK40N , how system picks the orrect/required BOM if both the BOM.s are Production BOM.

Thanks & Regards,

Ram

Former Member
0 Kudos

But while running std cost using TCode CK40N , how system picks the orrect/required BOM if both the BOM.s are Production BOM.

Thanks & Regards,

Ram

Former Member
0 Kudos

Hi Ram,

In CK11n,if you have two different versions,you have to enter only one widely used production version in 'qty. structure' tab page.If you don't have production version,you can enter BOM&routing/master recipe details there.

Regards,