Upload Project Stock (WBS) at MRP Area level and PIR consume.

vinaykuri4
Discoverer
0 Kudos
406

Hi Rohit,

We have requirement. Project Stock i.e., WBS level stock has to create under MRP area (SA05SWH) level, against this PIR allow to create with account assignment category Q(project stock at WBS) and consumption should happened based on qty at same MRP area level after MRP run and PR has to be created for left out qty.

Here we have created PIR at MRP area level (SA05SWH) without account assignment category Q (project stock -WBS level) without consumption mode (WBS value)

Reference Screen below where we can enter WBS (W-503-RE-02) with Account assign Category Q and WBS value field pop up to enter value as W-503-RE-02 so WBS level stock get consumed by PIR and show us left out qty of PIR after executing the MRP we can see MRP created PR based on PIR qty.

SA05 - Plant Level

in order to achieve the same at MRP level similar to plant level, what are config setting required please help us to do the same.

Please help us the same, as it is quite urgent.

Awaiting you valuable response on the same.

maggie11111111
Associate
Associate
0 Kudos
Hello, have the issue resolved? I met the same issue.