Uom change

Former Member
0 Kudos

Dear All,

i am trying to change the unit of measure for a particular material. there is no stock exists in any plant and storgae location and no outstanding sales or POs are there in the system. still i am not able to change the Uom due to the follwoing error message.

Stocks already exist at plant level.

Plant SLoc

2077 0001

Serial number profiles have already been assigned. The new base unit

of measure must therefore be dimensionless (that is, discrete).

Plant

2077

kindly advice me.

TIA

KOGI

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

tks

Former Member
0 Kudos

Hi,

Once u creted the material, system does not allow to change the UOM.

But option is maintain the altermnete UOM as Conversion factor in BAsic data tabe ,

Regards,

Andra

Former Member
0 Kudos

why can't we change the Uom, if we clear the stock and outstanding documetns from the system then it is possibel to change the Uom.

please advice me, what to do in this situation other than maintaining alternate unit of measure(this is final option).

Thanks

Former Member
0 Kudos

HI

In material master of the material create the new UOM as alternate unit of and maintain the conversion factor, and then save the data. Now again go to material master and change the UOM.

Regards

Girish

Former Member
0 Kudos

Hi,

Once you have assigned the UOM and after that if you have create any purchasing doc or if that material is assigned to an BOM then you cannot chage the UOM. But you can maintainthe alternative UOM