on 2009 Jun 01 6:02 PM
Hi Gurus,
When i'm tryin to change the UOM for a material on the matmas, The system is giving the message " Standard cost estimate already exists for the current period for the val area? What needs to be done? All the stock has been removed and the all the documetns have been killed. There is no open docs right now
Thanks
Anusha
Edited by: anusha vemulapati on Jun 1, 2009 7:02 PM
Hi
If a standard cost estimate already exits you can just delete the standard cost estimate and then change your UOM.
Std. Cost estimate can be deleted using CKR1 transaction, do that and then change UOM.
Thanks & Regards
Kishore
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
how do i change the UOM. I took care of the standard cost estiamte error. do i have to use 201 and 202 combination or what other movement types. The UOM need to be changed from EAB to EA. Wont there be a mimatch if i use 201 to give out the EAB unit and when i canceel the mat doc which effectively does a 202 to take in as EA?
Edited by: anusha vemulapati on Jun 2, 2009 3:44 PM
Hi,
Please ask your FI consultant to run the cost estimate to update with latest price and try changing the UOM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Vemulapati,
When you have stock in perticular material you canot change UOM because you have already stock and that stock belongs to documents are generated,
so better way do post or remove all stock and do what you want ,if have any dout do test inially in newly created material.
Hope this may helps you
Prem.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
10 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.