Dear Team,
During MIGO with respect to PO in SAP S/4Hana i got this error.
Tcode: FINSC_LEDGER
system is showing that not able to access the ledger. because Physical year verient is not assigned to the ledger . when i am assigning the ledger using above tcode system is showing the error. please find the snap below.
Example :assigning the 0001 Physical year variant to 0L ledger system is showing this error.
Message no. FINS_ACDOC_CUST137
FIN (Finance) SAP S/4HANA Finance for group reporting SAP S/4HANA Finance
Thanks and Regards,
Balaji Ghewari.