Dear Gurus,

i am having one strange requirement from client.They want to process in mass.i have given only one example.the same they want for all materials in the plant.

FG consists of two BOMs.Bom1 consists of X(FG 1nos)-Y(SFG 1nos)-Z(ROH 100kg).Bom2 consists of X(FG 1nos)-Y(SFG 1nos)-Z(ROH 10kg).I want to run MRP twice.In First time MRP system should consider BOM1 and Purchase Requistions for Z with quantity of 100kg should generate.System should not generate planned order for X and Y.in second time MRP run,system should consider BOM2 and system should generate planned order for X and Y.System should not generate Purchase requistion for z 10 kg.This is the requirement. How to map this scenario?

Please through some light to map this scenario

Guna

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Guna ,

You have twice posted the same thread . Please check my reply and let me know whether it was useful .

Check this link :

Neal

former_member539472
Contributor
0 Kudos

Dear,

U can use alternative BOM.

U can define two Production version.

For 1st production version u use alternative 1 with 100 KG ROH.

while in second case choose second production with alternative 2 with 100 KG.

former_member539472
Contributor
0 Kudos

Dear

If i m proper then reply & reward points