Transfer material from Valuated project non valuated project

Former Member
0 Kudos
928

Hi Experts,

While i am trying to transfer material from Valuated project stock to Non valuated project with T.Code MB1B movement type 415 'Q', I am getting following error.

WBS element has different inventory valuation

Message no. CN769

Diagnosis

The project definition for WBS element only allows the following stock control:

No project stock

No project stock with defined valuation M

' ' = non-valuated project stock

'M' = valuated project stock

System Response

Account assignment not possible.

Procedure

Change the settings for the project stock in the project definition (Control tab) or use a suitable WBS element.

Kindly suggest me how to trafer material from Non valued project stock to valuated project stock.

Regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Actually, you sohuld not be transferring stock to non-vlauated proejct directly. In case of non-valuated project, stock is never valuated while in case of valuated project it is valuated. So there is basic difference in valuation method. This will create inconistency if you attempt ot transfer it directly.

You should rather transfer this stock to general stock and then transfer to non-valuated project stock.

Regards,

Mahendra

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Try using 411 Q