on 2009 Aug 08 11:07 AM
Dear All,
I want assing tolerance limit to unplanned cost while passing the MIRO.
Is this possible, what the tolerance key for the same or is there any other config
Please help me to resolved the the issue
Thanks
Pramod
Hi Pramod,
The design of the system is such that unplanned delivery costs are not
included in the tolerance price check.
Please refer to attached note 33720.
with kind regards
Cora