Time Evalution and TIme Event!

seg_hr_it
Active Contributor
0 Kudos

Dear experts!

I have an example below:

employee: Check in: 6AM

Check out: 8AM

Check in 10AM

Check out 5PM.

How can I calculate: total working time of employee is (8-6) + ( 17-10) = 9hrs.

Please help me!

Thanks a lot!

Woody.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Min...

As per your query... I have few questions regarding the timings that you provided..

Is this flexitime or Positive time mgmt.

Vijay

seg_hr_it
Active Contributor
0 Kudos

Thanks for your response. But sorry I didn't get u point.

My requirements are: employee has check in check out in IT 2011, so now, in time schema, I would like to know how to retrieve 2 time pairs and calculate correctly. At the moment now, I just know how to check that time pair exist or not

Hope you understand my point.

Regards!

Woody.

Former Member
0 Kudos

Woody,

Check Schema TC00,

The daily work schedule is imported as follows to table TZP:

Time ID Time Duration

01 00.00 Time outside working time

02 08.00 Fill time

03 09.75 Core time

04 12.00 0.75 Core time break

05 09.00 0.25 Fill time break

The time ID is used to control the assignment of time types to time

pairs (function TIMTP) using the Time Type Determination Table (T555Z).

The time pairs generated by function P2000 in table TIP are assigned

pair type "1", if the day type according to the personal work schedule

is blank or "0", and pair type "2" if the day type is "1".

All clock times are decimalized beforehand. If there is a substitution

with cost distribution on the day being evaluated, the appropriate split

indicator is set.

Hopefully this helps,

Regi

seg_hr_it
Active Contributor
0 Kudos

Thanks for your support!

I can solve it by myself. I have use standard PRC TO00 and modify it. It's done now. Thanks god!

Regards!

Woody.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

In standard SCHEMA we have PCR TR11, which cumulate all tip entry for the day & we will get total no. of working hours.

Regards,

Lata

Former Member
0 Kudos

Hi,

If you want to calculate this type in your work schedule maintain dynamic work schedule, which automatically calcuates the exact time events in - out... of the employee (+ve time management).

Ex. Doctors appointment, short time permission... can come under this.....

in some service sectors/ It employee can enter at his/her own timing there wont be any stipulated time.... Like this sectors, we can suggest dynamic work schedules....for effective functionality.

cheers,.

thanks n regards,

seg_hr_it
Active Contributor
0 Kudos

Hi ksrinivasibs!

Could you please guide me how to get pair times of Time Event (2011) in Time Schema?

I don't now how to retrieve these check in check out to calculate employee's working time in Time Schema.

As I know, Time event, when using P2011 -> they are stored into internal Table TIP. But how to retrieve it, i dont have any idea.

Please help me!

Regards

Woody.