Target cost not being calculated

Former Member
0 Kudos

We are going to use Product Cost Collector in a repetitive manufacturing environment. We have done the following :

  1. Create Semi Finished Good material

  2. BOM and Rate Routing

  3. Production Version

  4. Standard Cost Estimate

  5. Product Cost Collector and Pre. Cost Estimate

  6. REM Confirmation and simultaneous GR of the material

 

Stock is updated and material document is created and shows link to Order in a order type RM01 (i.e. linked to Product Cost Collector)

But  when we execute KKS6 to calculate variances the system is not calculating target cost and put all actual cost in Remaining Variance.

Also no Good Receipt row is shown in KKBC_PKO

Plz help

Message was edited by: Chris Zaki

View Entire Topic
ajaycwa1981
Active Contributor
0 Kudos

Is your Contr area currency same as comp code currency??

if not, you must do settings in Costing Variant to update Std cost estimate in Contr Area currency..

Cancel your GR - > Re-release std cost estimate - Post GR and calculate Variances

OR

Apply note 1229004 if you dont want to do that

br, Ajay M

Former Member
0 Kudos

We have currency type = '20'  (i.e. Controlling Area Currency) but Currency is the same as Company Code Currency defined in Controlling Area

I cancelled confirmation, then deleted and re-run cost estimate.

After confirmation using MFBF and KKS6 but I still see:

Only remaining var. in version 0 - no target costs for 000000700060

Former Member
0 Kudos

Please help