Super BOM doesn't generate while run MRP from Sales Order

Former Member
0 Kudos

Hi all,

I am trying to make a Super BOM

where i have a material x as finished product, and i have 2 material as component for that finish product ( A and B )

i already create characteristic and assign it to the class 300, i also have created the configuration profile for the finish goods material and the object dependencies selection condition type for those material component in the BOM Item,

i also have check using simulation CU50 and the BOM is ok

But when i try to create Sales Order, entry the characteristic and run the MRP using MD02, the Super BOM doesn't explode

Is there anyone who can help to solve this problem??

Regards,

Marufat

Accepted Solutions (1)

Accepted Solutions (1)

former_member188931
Active Contributor
0 Kudos

Hi,

Does any planned order generated for the finished material? or you are talking about the components explosion?

If all the answer is Yes, then check and maintain the 2 collective requirement in MRP4 tab for the components material master.

And reprocess the MRP and check.

Thanks

Hrishi

Former Member
0 Kudos

Hi Hrishi,

Thx a lot,

the problem has been solved

Regards,

Marufat