I have done below stem of subcontracting:

1. For a production material (1001), one raw material (2001) is assigned.

2. Production process of 1001 is having four operations 10, 20, 30 and 40.

3. In this 10, 30, and 40 are internal operations and 20 is external operation (sub-contracting).

4. To address this, we created a dummy material (non-valuated) and named as 1001-20 (Finished product number + Operation to be performed).

5. This 1001-20 should form part of the component in BOM of 1001. That is BOM of 1001 will have components as raw material 2001 and this dummy material 1001-20. In routing, assign this dummy material 1001-20 to operation 20.

6. During BOM creation, i have removed costing relevancy for the item 1001-20.

7. In routing, operation 20 is created with a work center (which is external operation work center) with exteranl operation control key.

8. In operation details, for external processing, assign the info record (substracting info record ) of external processing.

9. Info record of external processing has to be created for vendor with relevance to the operation to be performed externally with vendor. (We are using material group field in the external processing in routing operation).

😎 i have given ind req. of (1001), header material. and then run mrp sys has been created req of haeder material (1001) and 2001 and also dummy material 1001-20.

Is it right?

10. When create production order with above set up, system will not create Purcha Req for external operation.

so kindly tell me where am i wrong ? or tell me detail substracting operation scanerio?

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

thx

Former Member
0 Kudos

Dear Surender,

Go to the operation view 0020 in the production order and press assignment tab, you find the purchase requisition number, notedown the purchase req no and go to ME51 and create purchase order with ref to Pur req. With ref to Pur order and thru mvmt type 541 send the material out thru T.Code MB1B and get in the material thru MB1C with mvmt type 101, against Pur Order to the respective stor loc and again issue to the shop floor thru mvmt type 201 thru T.Code MB1A. Continue the other operations as usual.

Former Member
0 Kudos

Check Procurement Type F in MRP Tab 2 of material master for Material related to Operation 20.

If it helps, kindly give points.

Regards,

RM

sundaresan_velayudam
Active Contributor
0 Kudos

Hi,

Once u confirmed the operation 10 then only the pr will created.

Also check the customizing

in order type dependent parameter( opl8)

maintain a setting of PR --- Reservation / purchase requisition 3