Former Member
0 Kudos
54

Hi all

We purchsed material from vendor A & send these material to vendor B directly for Job work

In PO we tick SC vendor & give vendor B.

Then made GR & MMBE report shows stock provide to vendor B.After that we wnat to make subcontracting challan for vendor B with reference to GR number.

But system not allow to make sub contracing challan.

showing follwoing "Document already exists for material document 5000086201 2008

Message no. 8I261 "

so how to make or find document exsit>

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

THIS MSG COMING ONLY FOR FEW MATERIAL .i CHECKED WITH ANOTHER MATERIAL CODE IT IS OK.

BUT ONLY FOR SOME MAR=TERIAL THESE TYPE OF MSG. COMING.

Former Member
0 Kudos

Hi sachin

during MIGO, u have to select "part-1 only" in excise tab. If have captured the excise invoice during MIGO, this error will come.

Please see whether u have captured excise invoice during MIGO.

If u have already captured e.i., u have to cancel the material document and e.i. and then create a MIGO document selecting "part-1 only". Then create S.C. challan with ref to this mat document and then capture e.i. with ref to matl document

hope this resolves ur problem

award points if found useful

Answers (3)

Answers (3)

kunal_ingale
Active Contributor
0 Kudos

hi buddy

check u might already processed the doc

regards

kunal

Former Member
0 Kudos

Hi sachin,

have u included movement type 101"o" in movement type groups.

U have to configure this for ur scenario in LG->TAX-ONGOODSMOVENT->India->business transactions->S.C.--->maintain movement type groups

here u have to include 101 "o" in group "0001". Also delete movement type 101 from group "0002"

hope this resolves ur porblem

award points if found useful

Former Member
0 Kudos

hI

IN SOME MATERIAL THIS TYPE OF MSG. COMING.

IS THERE ANY SEETING ON MATERIAL CODE .

former_member192897
Active Contributor
0 Kudos

I think you might have already done this. Plz check it once in J1IFR.

Former Member
0 Kudos

I reversed MIGO & make it agine but still same MSG coming .

ALso checked j1ifr not getting material document

former_member335885
Active Contributor
0 Kudos

Hi,

Check the Number Range Status if any one has changed it.

Check the configurations for Subcontracting process in the SPRO in CIN.

Thanks & Regards,

Kiran