Hi,

I have created material with strategy '30' created planned Independent requirement 100 for the same at the same time I have created sales order for 150 qty.now I run the MRP system created planned order for both PIR as well as for sales order. I converted both the planned orders to production & created the stock .done the delivery against the sales order as well as against the PIR .but PIR reduction doesn't takes place.can anybody tell me the exact functionality/use of planning strategy '30'.

PRD

Edited by: sap_prd87 on Oct 18, 2011 7:45 AM

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In strategy 30 you do not create PIRs, only sales orders are created. It is very similar to make to order. If you want PIR reduction at the time of delivery and push production by PIRs, use strategy 10. Also look at strategy 40 in which PIR allocation takes place at the time of sales order creation. When using these strategies be sure that requirement classes are assigned to PIRs and sales orders as described in SAP help.

Regards.

Answers (2)

Answers (2)

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear

For Strategy 30 please check what exact Reqmt type of KL Sales ord.manufact.by lot size use use this KL in Requirement class then PIR & sales order requirements will taken by MRP you get the Exact results

with Regards

Pushpalas

former_member186193
Active Contributor
0 Kudos

Dear,

Strategy 30

1. Both PIR & sales order requirements will taken by MRP.

2. Planned independent requirements are not consumed by sales and stock orders.

3. Stock left over from previous procurement can be used for any other sales order.

4. Planned orders will be created for both sales order quantity 100 Pcs & Demand quantity from MD61 as 100 Pcs.

5. Reduction pf PIR is same as Strategy 10.

Hope it will help you.

Regards,

Alok Tiwari

Former Member
0 Kudos

Hi,

What are basic of St.grp 30 give me any business case or scenario.I have tried for belwo scneario but as per views am littel bit confused pl check below scenario & revert back.

PIR :- 100 PCS

Sales order:- 70 PCS

Avail Stock :- 50 PCS

Lot size :- 2D (two day ) or EX

When i run mrp md02 system will generate two pl.order one is against my PIR & SO is it right or wrong?

Pl assist me on above scenario if i am wrong or pl provide correct solution of above scenario.

PrD_87

Former Member
0 Kudos

Hi,

- This strategy 30 is useful for companies that mainly produce for major customers but who also require the option of selling smaller requirements from stock. Example for industry : Contract-based industries, such as automotive suppliers for spare parts

- Sales order requirement will create planned order with no effect to Planned Independent Requirement (PIR).

- Stock is taken into account by reduce the planned order

Regards,

Arman Lie

Former Member
0 Kudos

dear expert,

I have tested below scenario my PlR= 120, SO=70, Avail Stock = 50 but when i am perfoming MRP run system will generate 2 Pl orders. Against PIR & SO system first do the net requriment cal means my first Pl order would be 70 & second also 70.

But when i am doing delivery my PIR would be reduced against deliver qty request you kindly advise me am right or wrong.

For PIR reduction i need to activate consumtion mode in material master level or how can reduce the PIR.

Kindly advise.As best way you give me sample scenario also with its result how the system behave.

Regards,

Prd_87