Scenario is make to order scenario

I have stock of raw material in my own storage location

but at a time of planned order is converted to production order error comes raw material shortage it means finish material ordered not consider my own stock, i want to consume my own stock for finished material production but its not happened what setting can i do for this

pl help me

Regards

Rahul

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You set Individual/ Coll Indicator as 2 Collective requirements only in MRP-4 View in Material Master.

Then you will be able for the same.

Regards,

Tejas

Answers (3)

Answers (3)

Former Member
0 Kudos

Transfer 1st from own stock to sales order stock by Movement 311E then convert to production order.

dhaval_choksi3
Active Contributor
0 Kudos

Hi Rahul,

It doesn't mean that that it doesn't consider your storage location stock.There may be some other problem are also there.

Do following checks.

- Check in Order.In Material Screen for that component Account Assignment is set (E).If yes then System will consider only Sales Order stock for Material Availability.This is due to In MRP 4 view of Material Master requirement type is set as Individual Requirement.Change it to Collective.

- Also Check in T.code OPJJ.

Check box for NO Storage Location should be Inactive. in this case system will consider All the storage location for material Availability.

Regards,

Dhaval

Former Member
0 Kudos

Hi,

For make to order system will not consume unrestricted use stock. It will consume only sale order stock.

If you want to consume existing stock for raw material, change Indiv/collective indicator in MRP4 view as Collective for one level above raw material (halb).

Regards,

Dharma

Former Member
0 Kudos

Hi

Pl tell me ind/Coll req. setting for fert material or raw material

Pl tell me

Regards

Former Member
0 Kudos

IND/COPLLECTIVE REQUIREMENT FOR RAW MATERIAL = 2 AND

IND/COPLLECTIVE REQUIREMENT FOR FERT MATERIAL = 1.

THEN IT WILL WORK.

Former Member
0 Kudos

hi

It will not work pl tell any other setting for consumption of raw material from our own stock against sales order

Regards & THANKS

Rahul

Former Member
0 Kudos

Hi,

Try with my suggestion:

For halb material set ind/ collective indicator - Collective.

for raw material , set - Ind/collective or collective

Regards,

Dharma

dhaval_choksi3
Active Contributor
0 Kudos

Hi Rahul,

In case of Production Order is created earlier then the changes you have done in Master then first to do "Read Master Data" then check it again.

Regards,

Dhaval

Former Member
0 Kudos

WHY?