on 2009 Jun 04 5:33 AM
Hi ,
My scenario:
I created 1 Configured material i.e. : Computer Dell Optiplex 360
I created characterstics for this material : RAM .
I maintained values for this characterstics as 1 GB and 2 GB and 4 GB.
While creating PO i have ordered 3 quantity i.e.
1st line item material Computer Dell Optiplex 360 and characterstic value as 1 GB.
2nd line item material Computer Dell Optiplex 360 and characterstic value as 2 GB
3rd line item material Computer Dell Optiplex 360 and characterstic value as 4 GB
Now i saved the PO.
I did the GR.
Same process will be followed for entire month.
Now at the end of month i want to see the report like
1GB ram is installed in how many systems?
2 GB installed in how many systems.?
4 GB installed in how many systems.?
How to do it.
Uts
Edited by: Utsav.agra on Jun 4, 2009 7:15 AM
Hi Utsav,
For the final assembly of 1GB ram systems do you have a a different name for the Finished product ?
If not i don't think there is a possibility to trace it .
Eg : Your requirement is to Mfg Systems with 2 GB Ram ?
But there is a shortage of 2 GB RAMS , and there is availablity of 1 GB RAM .
In this case do you prefer to use two 1GB RAM and complete the assembly or wait for until 2 GB are available ?
Regards
Ramesh Ch
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
tx
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
9 | |
8 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.