Dear gurus,

MY client requirment is

Query 1

In production order If missing parts exists,during co11n it should give error message" missing part exists" confirmation not possible.

query 2:

in colln in goods movement tab.i am finding only backflushed materials.for issue based.even though if mb1a 261 has done,material should be visible in goods movement tab in colln along with backflused materials

query 3:

if mb1a 261 not done for all components in production order.system should give error message"mb1a 261 not done,confirmation not possible"

please suggesy your solutions and ideas

guna

Accepted Solutions (1)

Accepted Solutions (1)

former_member184627
Active Contributor
0 Kudos

Hi Guna,

For Query 1:

You can maitain that if missing parts exist then release of order is not possible in transaction OPJK, for the plant & order type & business function 2.

For Query 2:

In transaction OPK4 select the good movement check box.

For Query 3:

You can use user exits as a solution.

Pl. refer

https://forums.sdn.sap.com/watches!add.jspa?forumID=144&threadID=482061

Regards,

Senthilkumar

Answers (1)

Answers (1)

Former Member
0 Kudos

Query 1

In production order If missing parts exists,during co11n it should give error message" missing part exists" confirmation not possible. -

In STD SAP it is not possible, you can use - User exit for it CONFPI02 and CONFPI03...in which you have CAUFVD structure from which you can get the order number and see the ststus of order. If the order ststus has MAST, i.e. material shortage, then make the system to give this message.

query 2:

in colln in goods movement tab.i am finding only backflushed materials.for issue based.even though if mb1a 261 has done,material should be visible in goods movement tab in colln along with backflused materials - totally confused..pl explain better..

if you haqve a backflush tick in component line in production order, then you cannot issue manually in MB1A. During confirmation system will show that materials for issue.

query 3:

if mb1a 261 not done for all components in production order.system should give error message"mb1a 261 not done,confirmation not possible"

Same As 1, only difference is you need to check in MSEG tabel where any 261 mov happened to the order...but it is very complicated logic as for each material you need to check this and system performance issue may arise.

pl come back