on 2020 Apr 23 10:11 AM
Dear Expert,
I am facing issue for stock posting during skipping process in DMR (Dynamic Modification Rule). In DMR, Dynamic Mod. Level is defined at Lot Level & Quality Level will update at Insp. Lot creation.
As I understand in skipping stage, the insp. lot generated will be having insp. status ‘SKIP’ and the stock will appear in unrestricted.
But in my case during Skipping stage once the GR done for material, the stock appears in ‘GR Blocked Stock’ generating mvt. 103. & ‘SKIP’ status update in inspection lot.
How can we avoid to post the stock in ‘GR Block’ and make it posting to unrestricted using mvt. 101?
Thanks in Advance.
BR,
Request clarification before answering.
If you see a 103 instead of 101 it has to do with your receipting process, not the skip lot process.
The lot isn't created until the first material document is created which includes the movement type.
Do you have some type of automated process doing receipts. Make sure you are checking the material document linked to the inspection lot as referenced in QA03.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
39 | |
8 | |
6 | |
5 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.