cancel
Showing results for 
Search instead for 
Did you mean: 

SHORT DUMP in MIRO

Former Member
0 Kudos

Hello,

I am facing a problem in which MIRO has SHORT DUMP when posted with the Material. This has never happened before and suddenly this problem started.

Has anybody ever faced something similar?

Roger

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

may be MM period is closed ? check ST22 u will some idea.

Regards

Prabhu

Former Member
0 Kudos

Thanks for the replies but the issue is still under investigation.

It looks as though an earlier transportation last period impacted on this. An earlier productionizing slot came to our prod system and thus caused this.

Roger

Former Member
0 Kudos

Hi Roger

Please check whether the material has been created with all the views. Material master data is very crucial for the invoice processing. I think you are posting invoice with refernece to a PO.

You can also analyse the dump in ST22

Thanks

Ashok

Former Member
0 Kudos

Hi Ashok

the problem is that it is not only one material but several ones. and the strange thing is that they were used last period and now they are presenting problems.

i am not sure whether a massive change might have caused this. we are still investigating.

Roger