Hello All,

I have made good issue against production order for x material & qty 100 nos.

But during assembly the production manager found 50 nos as a rejected material.

Now how can i get back this material to storage location so that i can send back this rejected material to vendor?

As per my knowldge, i need to do reversal of good issue with mvt type 262 & once the material comes in storgae location then i have to do transfer posting for puting this material in to block stock.

After that i have to prepare return delivery with mvt type 122.

Is this is the right procedure?

Please guide me.

Thanks in advance.

Shailesh

Accepted Solutions (1)

Accepted Solutions (1)

jagadeesh_madiwalar
Active Contributor
0 Kudos

Yes.

Go Ahead.

Answers (1)

Answers (1)

Former Member
0 Kudos

Ya that is right procedure. While doing GR you need to post material in Quality Inspection. You cannot reject 50% of the material without quality check.