Dear all,

We are using 5.00.

we have defined 3 shifts in our plant

7 - 15

15--21

21--07hr

We do confirmations at the end of the shift operation wise giving start and end time of shift.

Now we want prepare shiftwise production, scrap ,rework report.

There are number of operations of various production orders are confirmed at the end of the shift. how to get this data.

please help

thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Sj,

Use COOIS or else MCRE and MCP3 for meeting this requirement.

Regards

Mangalraj.S

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

There is no such Standard report available. U need to Develop a customized report for the shift wise Production. Refer the Tables AFRU and AUFM to get the relevant data.

Regards

Brahmaji

former_member335796
Active Contributor
0 Kudos

Hi,

In ECC 6 EhP-3, there is a good feature to handle this..

But, in ERP 5.0, you can handle this by way of some customization and using the COOIS/Confirmations(list)..

If you want to have and manage the appropriate shift during confirmation, create a new Standard Value and Activity "Shift" and at the time of confirmation enter the shift.

Please refer below Link for creation of "Shift"/Parameter.. as an example.

Which I have posted some 3-4 years back..

http://www.sap-img.com/production/set-parameter-and-work-center-formula.htm

Revert for further discussion..

Best Regards,