hi all,

I am implementing PP-PI. i have configure order parameters according to standard SAP system.

now i am checking orders creation, system shows error scheduling parameters not maintain for the plant & when i track the procedure system locates in plant maintenance tab for capacity planning under scheduling parameters.

please let me know where i am wrong.

Accepted Solutions (1)

Accepted Solutions (1)

Anupam1143
Active Contributor
0 Kudos

HI

You need to define the scheduling parameters for the order type which you are using in PP PI in T code OPUZ same in case of discrete in t code OPU3.

check and revert

Regards

Anupam Sharma

Answers (2)

Answers (2)

Former Member
0 Kudos

problem solved

thanks 2 all

former_member199502
Active Contributor
0 Kudos

Hi,

Maintain Sheduling parameters under production-Capacity Requirements Planning-Operations-Scheduling-Define scheduling parameters for process orders(Tcode-OPUZ)

Hope it helps

Former Member
0 Kudos

sir,

thanks for reply,

i already maintain the parameters but still system showing me a error.

former_member199502
Active Contributor
0 Kudos

Hi,

Hope you have maintained Sheduling parameters for the combination of order type,plant and production shecduler.Kindly check whether all this are correct.whether the production scheduler for that material is maintained correctly.

Maintain with combination of order typeplant for example PI01,1000,*.

If still error is there,give the error msg number and its application

Former Member
0 Kudos

Hi,

error message nos. ?

Have you done the setup in OPU5 for planned orders for the plant?

Regards,

Vivek

Former Member
0 Kudos

sir, please find the erro

Scheduling parameters for process orders have not been entered

Message no. CT609

Diagnosis

No scheduling parameters have been entered for process orders in

Customizing plant PLBP, order type ZP01 and production scheduler BFB. If

you do not enter a selection ID for detailed, rate-based or rough-cut

planning no scheduling can be carried out. The selection ID determines

the priority for selecting the master recipe according to the criteria

task list usage, type and status.

The scheduling type has to be entered too.

Procedure

Enter scheduling parameters for process orders and a selection ID for

detailed, rate-based and rough-cut planning. You must also enter a

scheduling type.