One of my Key figure (KPI) on my SOP flexible plan needs to be "Total Inventory Cost". I was trying to see how I can bring the Material level Standard Cost to my Flexible plan. Is there a standard way to do it without custom ?

For example:

Production Plan: 100 ( I will run a Macro to calculate this value )

Standard Cost: 10 ( should be from Material master )

Total Inventory Cost: 1000 ( I can have a Macro to get this value calculated from Production Plan & Standard Cost)

thanks for the help.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Can someone assist? thank you

Former Member
0 Kudos

Hi,

Any suggestion ? thanks