on 2008 Sep 24 7:08 AM
Hello SAP-Guruu2019s
Pls tell me the process flow for Repetitive Mfg.
Any comments welcome & Thanks in advance.
Dear,
Repetative manufacturing is period based planning and not based on orders. Normally same products will be manufactured over longer period of time..products will not change frequently. Confirmation is from backflushing and settlement is through from product cost collector for the period. Confirmaton will be without ref to planned orders. Planned orders are sufficient to carry out shop floor activity. In master data production versions and cost collector is must where this is not mandatory in discreate.
You do these steps for rem production:
mm01 : Material Master
- MRP - 4 view you click rem
cs01 : Create Bom
cr01 : Create Work Center
ca21 : Create Rate Routing
mm02 : Prodn Version
md61 : Create PIR
mc74 : Transfer PIR to Demand
kkf6n : Create Product Cost Collector
mb1c : Create Stock
md02 : MRP run
mfbf : Rem Back Flush
The detailed sequence of T.Codes for REM including Std cost estimate.
Material master - MM01
BOM - CS01
Price Planning - KP26
Work Center - CR01
Rate Routing - CA21
Material Master Change, enter production version - MM02 (MRP 4 View)
Product Cost Collector - KKF6N
Costing - CK40N
Backflushing - MFBF
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Did you get what you want? Please tell me what you required more?
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. Create demand by MD61 or MD50 planning table
2. Run MRP by MD02
3. Check the stock req list in MD04
4. Do goods receipt by MIGO for raw material.
5. For FERT material do backflush confirmation by MFBF.
6. Check the stock in MMBE.
Note: goods issue will happen automatically by 261 mvt. Goods receipt by 131 mvt.
Material master, BOM, rate routing , Production version are required for REM. In MRP4 view tick repetetive Manufacturing & assign REM profile.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Create MM with REM tick in MRP 4 view
Create BOM
Create Rate Routing CA21
Create Production Verson C223
Create Wk Center CR01
Create REM Profile OSPT
Create Product cost collector KKF6N
Create Planned Order MD11
Backflush MFBF
Nilam -)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
112 | |
9 | |
8 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.