sales order for planning strategy 40

0 Kudos
1,648

Hi friends,

In planning strategy 40 which is a make to stock scenario, both PIR and sales order are valid. But PIR is given priority. When i created sales order for a finished material with strategy 40 and no PIR, and ran MRP Md02, no planned orders are generated. Can anyone tell me what setting to be done to generate planned order for strgy 40 with only sales order ie, no PIR?

Accepted Solutions (0)

Answers (3)

Answers (3)

0 Kudos

Dear Rupesh, Shailesh,

OPPS

OVZG

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Sayak,

I think you have not read my reply completely. Please go through it once and revert back.

Best Regards,

R.Brahmankar

0 Kudos

Dear Rupesh,

In SO schedule lines is CP

But in VBBE no schedule lines.

I am PP consultant so not much knowledge in SD.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Sayak,

I assume sales order is not appearing in MD04.

Does Availability check in material master MRP 3 view is daily requirement?

Please refer SAP KBA carefully

1992885 - MD04: Problems with sales orders and deliveries

Question

5 - The sales order is not displayed on MD04

207942 - MRP: Problems with requirements from sales order/delivery

1649669 - Sales order number or delivery number is not displayed in transaction MD04

If the requirements are inconsistent then you can correct them by using the report SDRQCR21.

Check VOV6 schedule line settings.

Check Fixed Date  & Quantity + Credit Check

Reason for rejection in sales order

Best Regards,

R.Brahmankar

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

See points 4 and 5 of the following document:

http://scn.sap.com/docs/DOC-50641

BR
Caetano

kiran_kumar179
Active Contributor
0 Kudos

Sayak,

Can you post the MD04 snap shot.

Your issue seems to be with Sales order transfer of requirements

Read below blog point 3 and 5 for more info

BR
KK

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Sayak,

System should generate the planned order for sales order.

Please check sales order appearing in MD04 and VBBE table

It should have MRP relevant schedule line.

Sales requirements can be reorganized with report SDRQCR21.

Check the setting defined for the field NO MRP for the sales order requirement class/type customizing on transaction OVZG

Also share screen shot of MD04 and planning strategy OPPS.

Best Regards,

R.Brahmankar

shailesh_mishra5
Product and Topic Expert
Product and Topic Expert
0 Kudos

Dear Sayak,

When sales order is entered, 2 things happens. Availability check and Transfer of requirement.

I believe you dont have sufficient stock in warehouse, so availability check will run. Now, I believe TOR is not happening. Here you have to see some settings are blocking your TOR to happen.

Few check Points.

  • In customizing, Availability Check and Transfer of Requirements SD, you have to see the corresponding Req class of 50,

  • Check in Procurement Tab of your Sales Order, Item category as Tan, schedule Line category CP and Req type KSV.
  • Check in VOV5, Item category Tan, MRP type PD and Proposed scheduled line Category CP
  • Also give us the screenshot of OPPS as suggested by Rupesh.

Also how are you running MRP, I mean with what Creation Indicator MRP is being run in MD02?

Best regards

Shailesh

Former Member
0 Kudos

Sayak,

I will assume that there is a shortage (e.g. there is not enough FGs stock to cover the Sales order requirement).

What is the requirements type in the Sales document (VA03 > Procurement tab)

Best Regards,

DB49

0 Kudos

Yes there is no stock of FG or the semi finished materials.

Sales order req type is KSV.

If I create PIR then all planned orders are generated.

But my question is can we generate planned orders for strategy 40 only with sales order ie, no PIR?

Anupam1143
Active Contributor
0 Kudos

Hi,

Check the schedule line category in sales order >schedule lines> as CP. Also check in T code in OVZ8 whether for CP type RQ check box is selected.

Regards,

Anupam Sharma

0 Kudos

Thank you for your feed back. Schedule line category is CP. In OVZ8 for CP Rq checkbox is checked from before.