on 2012 Feb 17 7:14 AM
Base unit of naterial is EA
Order unit is Pac
i set in material master, order unit 1 PAC=50 EA
1) P.R created for 140 EA
2) when i try to convert PO there shows 2.8 Pack. I need here to round 3 pack. For thet i created rounding profile and assign with inforecord. But system get rounded to 2 pack. I need here to round as 3 pack ( not as 2 pack). Where is the Exact error.
Regards
Karan
Dear,
GO to Transaction code OLME
OLME -> Order Optimizing ->Quantity Optimizing and Allowed Logistics Units of Measure ->Unit of Measure Rounding Rules
Here for your rounding rule use % rounding up only and keep % rounding down as blank
Here SAP link with example
http://help.sap.com/saphelp_46c/helpdata/en/4c/420da3470a11d1894a0000e8323352/content.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
Use CUNI T code for set rounding so that it should be round up as per requirement of lower limit & upper limit
Regards
ragini
Edited by: ragini_mm on Feb 17, 2012 12:55 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
112 | |
9 | |
8 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.