on 2010 May 13 5:13 PM
Hi,
Following is a scenario
PP01 first operation----
confirmed Qty 5 with co11n
PP01 second operation----
confirmed Qty 5 with co11n
QM01 third operation----
Lot is generated for Inspection and confirmed Qty 4 and 1 is for rework
PP01 Fourth operation----
PP01 Fifth operation
Here i want it should not allow to confirm 5 Qtys in third operation but its allowing. I want to avoid this.
Moreover, please guide me how can i introduce 1 for rework from third operation in operation 0020 for rework in above case.
Regards,
wadajkar
go to OPK4 set result rec : error message if no insp.result exist and select control key qm03 in operation set confirmation required
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
This solves first question. Can you please guide me for following problem
After creating production order for 5 Qtys and confirming operations in following manner
PP01 first operation----
confirmed Qty 5 with co11n
PP01 second operation----
confirmed Qty 5 with co11n
QM01 third operation----
Lot is generated for Inspection and confirmed Qty 4 and 1 is for rework
PP01 Fourth operation----
PP01 Fifth operation
please guide me how can i reintroduce rework Qty in routing for rework from third operation to the operation 0020 in above case.
Regards,
Samir
User | Count |
---|---|
104 | |
10 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.