cancel
Showing results for 
Search instead for 
Did you mean: 

Reversal of Order posting

former_member224727
Active Participant
0 Kudos

We have done order GR with 101 movement. Material is inspection managed, so 04 insp type insp lot created. QI clear lot and posted stock in unrestricted by mistake, b'se we suppose to cancel this order.

Now QI reverse inspection lot stock posting and UD. Stock is back again in QI. Now we want to reverse order. What is procedure? Order status is TECO DLV CNF

Actually this order is created from SO, make to order scenario. So our final goal is reject SO.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Eric,

if it is technically completed  u have to revoke technically then read master & do it.

IF it is not technically completed then click on read master & reverse.

If the goods have been issued to production then reverse through 102 mvmt type.click on goto then on on master data reading.

or

To cancel  the production order confirmation you can use T Code CO13.

Hope ur getting clear idea.

TnX

former_member224727
Active Participant
0 Kudos

Thanks for reply, in my case I already did goods movement against order. So how should I reverse goods movement (101 & 261) first? Do I need to go MIGO to reverse original document?

I believe after that as per your suggestion I have to do read master data and cancel confirmation. Correct me if I'm wrong.

After that I should be able to reject my SO. Right?

Former Member
0 Kudos

Hi Eric,

You can do the reversal of goods movement by two ways -

Either by MIGO - 102 /262 movements

and by MBST - reversing the document number that go generated.


Both will give the same result.

You can reverse the confirmation - CORK or CORS.

Then read the production order. It is to original CRTD stage.

Need to follow these steps.

Regards,
Srini