hi friends,

i have a secenerio, in which i m sending material to sub-contractor, and tat material is being send via RTP (returnable transport packing), and when i m suppose to get my final product, the vendor should use the same RTP to send it back to my premise.

How can i map in SAP.

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

i am considering you know the Subcontract process with movement types, if not please search it in SDN.

you can create a new Material like Box or carrier, crates, with the material type VERP, LEER or you can use the functionality of KANBAN container.

include that in GI as another line item free of charge, and return the same material from vendor. so that the material value will never change and you can use the same material for next delivery also.

Try in development once and go ahead in production

regards,

Ninad Kshirsagar

Answers (3)

Answers (3)

Former Member
0 Kudos

define rtp as material with negative quantity in bom

you can track how much rtp you are sending via po -ve number for rtp

and while taking back rtp can be taken as by product

Former Member
0 Kudos

hi

problem to this is that it would be reflected only once GR is done. till that time there would be no track.

thanks

Ankit

Former Member
0 Kudos

HI

Whn you do 541, u can add that material, but dont add it to the BOM. When you do the GR at that time do a 542 to reverse the same.

Do knw how wel it is excepted.

Let me check if you can have a z type of 543 so that you can except it via 101.

Thanks

Ankit