on 2010 Dec 20 4:17 PM
Hi,
I have a scenario in for prod order in process inspection.
I have an operation to machine the shaft for 3 hrs. And every hour I need to take an reading and note down in the inspection. For the same reason I created master data of MIC Quantitative, Sampling procedure with sample size 1
On routing for the same material, Usage 1 and status 4 Released for general, Inspection point 200 and sapmle drawing procedure with fixed qty 3.
Generated a prod order and released, got inspection lot for lot origin 03. But when I try to enter 3 different readings per hour could not able to achieve this.
Kindly help me out.
Regards,
N. Nagaraju
Are u using physical samples? If not, I wouldn't use the sample drawing procedure.
Set your characteristic to individual results recording in your control indicators. Set the sampling procedure to be a fixed sample size of three.
You should be able enter three results then for the characteristic.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
8 | |
6 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.