on 2009 Apr 27 12:36 PM
Dear Experts,
I have a scenario where I want to group similar resources under specific resource types and finally arrive at a situation where if I try to change the resource in an order from the drop-down menu in the resource field, it only shows those particular resources which belong to the same category. Can anybody suggest a way to map this ?
Thanx in anticipation.
Regards
Sm.
Hi
This can be achieved by using Work center class type 019.
For example if you have manual lathe machine and automatic lathe machine which can be used to do the same the operaion. Then the resource can be selected after creating the process order based on availability.
1. Create a class type 019 and assign the required characteristics of the work center.
2. Create a resource using CRC1 and Goto Extras-->Clasification and assign the class created.
3. Create Recipe.
4. Select the operation in the recipe and click on the resource selection criteria radio button in the bottom menu and mention the selection criteria.
5. Create a process order and if more than one work center is satifying the criteria mentioned in the recipe then you can change the resouce in process order by cliking execute resource selection.
Regards
S.Senthil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
A simple way of achieving your scenario is to define a resource network (linking all your "physical" resources) and use it at recipe header. No resource is required in the operation.
When releasing the process order (based on the a.m. recipe) SAP asks you to define the resource to be used in each operation / phase.
Let me know if this can be helpful....
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
can you please explain in detail your scenario.
I have a solution.
Regards
YMREDDY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Reddy,
I have 20 and 5 reactors of 1200 and 2000 litres capacity respectively. Suppose in my recipe i have assigned a reactor of 1200 lit capacity for 1000 kg of a material (FG) X. I have a scenario where on the day of actual production the header quantity of X has changed to 2000 and the particular resource mentioned in recipe is also unavailable. I want to have a provision so that the system can choose from the actual header quantity of X, the list of resources available to produce X i.e. i want the system to propose a reactor from the list of reactors of 2000 litr capacity. However, the base unit of measurement of X is in kg and unit of capacity in reactors is hour. Please suggest solution.
Regards
Sm.
Edited by: Sm on Apr 28, 2009 7:00PM
Sm,
Just a thought why not use Individual Capacities concept to define your workcenter? Example If I have 6 machines of same make and capabilities, I would create it as a single Workcenter and in capacity Header I would assign 6 Individual Capacities.
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
8 | |
8 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.