Requirements type VSEV does not exist

Former Member
0 Kudos
1,555

Hi experts,

In MPS scenario I am transferring PIR quantity from info structure table SXXX to MD63. But in MD63 if I try to display if the PIR's are transferred for the Product group/material, I get the error as Errors occurred while reading data, see the message log --> "Requirements type VSEV does not exist" and no PIR's are displayed in MD63. How fix this error and from where the Requirements type value- VSEV gets picked.

Thanks

Sakthi

Accepted Solutions (1)

Accepted Solutions (1)

former_member195779
Active Participant
0 Kudos

Hi Sakthi,

Pleae check what user parameter you have maintained on MD63. If its maintaned as VSEV remove it and than run MD63

Regards,

Amarnath Dube

Former Member
0 Kudos

Hi Amarnath,

Requirements type in User parmeters is blank.

Thanks

Sakthi

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

While transferring the forecast the demand management what is the requirement type?

Please refer section Transfer Planning Data to Demand Management  from below document.

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hello Brahmankar,

Thanks for the good document flow. I use RMCA9156 to transfer plan to demand management. So I don't add Req type in RMCA9156.

If I add strategy 60 as below, the error disapears. But is the logic correct?

*Strategy group  10 Make-to-stock production


*Main Strategy   10 Make-to-stock production
*Strategy        60 Planning with planning material

Thanks

Sakthi

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Share the screen shot of variant of program RMCA9156?

Go to MARC table and check have you used the planning strategy 60 for any material?

Then transfer  only these materials to demand management which are having planning strategy 60 planning with planning material.

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hi Brahmankar,

I want to transfer only materials with make to stock 10 strategy group only. But to eliminate the error in MD63 I simply added sub strategy 60 to strategy group 10.

Main Strategy   10 Make-to-stock production

*Strategy        60 Planning with planning material

Wanted to know if it is logical or not logical at all to do like this because strategy grp 10 is MTS & Strategy group 60 is MTO. So can I add sub strategy 60 in strategy group 10?

Thanks

Sakthi

Answers (5)

Answers (5)

Former Member
0 Kudos

Thank you experts

Sakthi

dimasluis_defaria
Active Participant
0 Kudos

Hi Sakti,

1) Try to execute MD61 for the materials, manually.  You can find which material is with mistake

Because you are working with groups right?

2) Are you using MC75 to transfer PIR?  Check because in MC75, there has the field requeriments type

Dimas Faria

marianoc
Active Contributor
0 Kudos

Hello,

VSEV is determined when you plan using a planning material.

For example, when the strategy group is 63 and you load forecast with MD61, the reqtype is VSEV.

Check if you have this setup for your material. Check if you have strategy group 63 or if you have setup the plannng material in the material master (MRP3 view).

Kind Regards,

Mariano

dimasluis_defaria
Active Participant
0 Kudos

Hi Sakti,

Requirements type is used in the tcodes: OPPS  (after is used in the  OPPT)


Strategy group is used in the material master (view MRP3) or MRP Group (OPPR) view MRP1


Strategy group contains planning strategy that is used in MD61


You need to check the group of strategy / strategy of the materials of your material group


Regards


Dimas Faria


Former Member
0 Kudos

Hi Dimas,

for material codes, the Strategy group       10      Make-to-stock production

In OPPS for Strategy        10 Make-to-stock production --

Reqmts type for indep.reqmts   LSF  Make-to-stock production

Reqmts class                   100  Make-to-stock prod.

so why it says VSEV type error, not clear

Thanks

Sakthi

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Please check if you have any changes in material master for planing strategy?

Also in MD63 check the user parameter (F5) any default Requirements type VSEV  is defined.

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hi Brahmankar,

MM03 shows no change history in planning strategy. Also MD63 has no default values (F5) defined.

Thanks

Sakthi

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Check in the customizing transaction OMP1 if VSEV actually exists.

BR
Caetano

Former Member
0 Kudos

Hi Caetano,

Req typ -VSEV exists with Req class- 104 in OMP1. Still I get the above error in MD63.

Thanks

Sakthi

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello


Can you please point what is the error message number and ID? You can also check where it is triggered following the steps described on the document below:

If you find where it is triggered, please share a screenshot of the debugger.

BR
Caetano

Former Member
0 Kudos

Hi Caetano,

In MD63

Message type = W

Area = 6P

Message number = 30

Thanks

Sakthi