on 2007 Dec 28 4:09 AM
Dear PP consultants,
When i am doing MFBF transaction for parent part system suppos to post child item automatically and parent item should go to stock.
We r using product cost controller for product costing
It is throwing the error message
" Error determining cost estimate"
pl help to fix this
Thanks in advance
A.Gururajan
Hi,
Rem profile that has been assigned for header material will take care of GI for child materails and GR for parent materail.
Before doing backflush u have to any one below costestimates.
1.Prelimianry cost estimate - KKf6n
2.Standard cost estimate ck11n - Mark & release cost - Ck24
Rem profile controls the cost estimate methods - plz check correct cost estimate method has been selected in REM porfile at customizing.
Regards
Pradeep
Edited by: Pradeep Kumar on Dec 28, 2007 9:54 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Gururajan,
After the master datas are ready in REM - Repetitive
Manufacturing,like material master,BOM,Rate
Routing,Production version,then proceed with product cost
collector creation using T code KKF6N --->enter the
plant ,material -
> click the create button,select the
production version once the pop up message comes----save
the datas--->system again pops up create preliminary cost
estimate for the material----click on Yes.
Then carryout the cost rollup using T code CK40N and then
only you can do production confirmation using MFBF.
in you case check in KKF6N,the status of the estimate
whether its green or with yellow status or Red.
It should be KA - costed without errors.
If founf KF,check the errors,rectify it and then come back to
KKF6N.
Goto Change mode ,click the cost button and check again.
Regards
Mangal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The problem is system cannot determine the cost estimate to backflush the activities for quantities .
I hope u have created product cost cellecter and might have not done preliminary cost estimate in KKF6n.
Regards
Pradeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
please check the date on which cost estimate has been done?you should do confirmation in MFBF on the same date and onwards from cost estimate date.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
96 | |
8 | |
6 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.