Release Strategy

Former Member
0 Kudos

Dear All,

a)How the following options to be configured in Releasae strategy

for eg:

1)Only one Super release

2)One release after the other upto how many releases(eg 3 releases)

3)Upto 100000,first person has to release

from 100001 to 500000,second person has to release

more than 500000,third person has to release.

In this if lower level is absent,the higher level should also release.How to configure this?

b)Please also confirm,apart from the other options,any other option is there?

Regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

configure release strategy as per std. and set prerequisite as follows

i.e suppose there are 3 release codes 1 2 3

1 not released

2 not released

3 Released

R Released

1 not released

2 released

3 Released

R Released

1 released

2 released

3 Released

R Released

means thought 1 is absent 2 nad 3 can release PO

refer

http://www.sap123.com/showthread.php?t=59

for configuration

Vishal...

Former Member
0 Kudos

Hi,

If i make three release strategy as per ur suggestion,which releasse strategy in PO will be selected or we have to define in SPRO for PO to select?

Please reply

Regards

Former Member
0 Kudos

It depends on the characteristic value that you set. 3 release strategy setup to cover your release strategy , so you set total net value as on of characteristic value.

Then after PO creation it will automatically pickup the release strategy as per your setup.

Former Member
0 Kudos

hi

in above thread i have only explained how to use release codes for alternate release in release prerequisite

U can define release strategy as per value slab and use required release codes in that like

> 100000 ,first person has to release use 1 as release code in A1 release strategy

100000.01 to 500000 ,second person has to release use 1 and 2 RC in A2 release strategy

< 500000 ,third person has to release. use 1,2 and 3 RC in R3 release strategy with correct release prerequisite

Vishal...

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi

If it is configuration change do it in release prerequisite and if it is authority issue please assign the set of roles to one user.

If workflow is involved assign the hierarchy level to the single user.

Regards

Raja

Former Member
0 Kudos

Hi,

Create the release strategy based on the Classification. Create your characteristics with required table & field names in the table entries & restrict the characteristics to class 032.

Create the required class & select the characteristics in the class.

Create the release strategy / release code & select the required charcteristics. Assign required fields (for example - PO type, PO Value). Create multiple release strategies if required.

Then assign the prerequisites for the release code as another release code.

Assign these release codes in the roles & then assign these roles to the users.

For giving multiple release authorities to single person, you may assign different level relase codes to single person,

Regards,

Prashant

Former Member
0 Kudos

Hi,

Please give reply.

Regards