on 2013 Jan 07 11:57 AM
Hi,
IN standard SAP can any one clear on bellow scenarios.
1) can i do stock transfer from store to store in same plant using STO without SD.
2) can i do stock transfer from store to store in same plant with SD using STO
Regards,
Ravi.
If you are using ECC6 it is possible. Please check Setup stock transfer between storage locations.
Check this link which explains in detail:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Yes you can do the stock transfer between two storage locations using STO, refer below thread for more details.
https://scn.sap.com/thread/2034131
Regards
Vijay
Hello,
you can use 311 and 315 from one store to another store in same plant .But here STO Process doesnt involve process to transfer the Material from one store to another store in same plant .
If you dont mind ,Can you explain in detail with example ?
If you have any doubts please let me know.
Thanks,
Naren
Hi,
1) Stock transfer store to store, one step procedure 311.
2) Stock transfer store to store, two step procedure 313,315.
3) we can configure store to store stock transfer in same plant with STO and with shipping.
my Question is can we do stock transfer store to store in same plant with STO without shipping.(like in plant to plant mov typ-351)
Thanks,
Ravi.
To be frank, i have not heard of Stock transfer between Storage locations via STO MM route.
You can proceed with 311 or 313, 315 movement type for STO between locations with in plant.
STO between storage locations is possible from ECC 6.0 with SD route and there is no change in the Movement type triggered during PGI (641) or Receipt (101) in this process.